42 - Work Holding - Section 6 Microrouter CNC Machine User's Manual
Engineers
square.
6: Assembling the Work Holding Clamp Rails
To fit the clamp rails in the Microrouter working area:
1) Position the clamp rails inside the machine, between the front
and rear X axis sliderail frames. Align the clamp rails at right
angles to the X axis sliderail frames.
Front X axis
sliderail frame.
Rear X axis
sliderail frame.
Clamp
rails.
2) Slide the bottom U shaped section of the clamp rail assembly
onto both the front and rear X axis sliderail frames, using the two
slots cut into the channel ends. Align the clamp rail so the
outermost allen bolts are positioned over the X axis sliderail
frames.
3) Check the clamp rails lie at
right angles to the X axis
sliderail frames using an
engineers square. Using a
5mm allen key, tighten the
outermost allen bolts
(turning clockwise, when
viewed from above) to lock
the bottom U shaped
sections to X axis sliderail
frame.
X axis
sliderail
frame.
Top U shaped
section of
clamp rail.
Bottom U
shaped section
of clamp rail.
Outermost allen
bolt locks bottom
U shaped section
to X axis sliderail
frame.
Turn 5mm
allen key
clockwise to
tighten bolt.